Mercedes-Benz EQS charging.

More than 3 million charging points worldwide

MB.CHARGE Public.

The integrated charging service MB.CHARGE Public replaces the previous Mercedes me Charge service and provides customers easy access to one of the largest charging networks in the world with over three million charging points from more than 1,500 charging station operators.

MB.CHARGE Public: Mercedes-Benz drives electric mobility forward with simplified charging rates

Easy Access to Public Charging: MB.CHARGE Public offers three charging tariffs tailored to different driving and charging needs. With a single charging contract, customers can access more than 3 million charging points worldwide across numerous charging point operators. Charging sessions are automatically billed through MB.CHARGE Public, providing a seamless charging experience.

MB.CHARGE Public will be available to fleet and business customers starting in April 2025, including a charging fleet portal.
MB.CHARGE Public will be available to fleet and business customers starting in April 2025, including a charging fleet portal.
With MB.CHARGE, Mercedes-Benz will bring together all digital charging solutions and seamlessly connect them with the operating system of its electric vehicles.
With MB.CHARGE, Mercedes-Benz will bring together all digital charging solutions and seamlessly connect them with the operating system of its electric vehicles.
Mercedes-Benz consistently relies on the use of electricity from renewable energies. Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. . If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates (incl. EKOenergy ecolabel). These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
Mercedes-Benz consistently relies on the use of electricity from renewable energies. Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. . If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates (incl. EKOenergy ecolabel). These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
MB.CHARGE Public will be available to fleet and business customers starting in April 2025, including a charging fleet portal.
With MB.CHARGE, Mercedes-Benz will bring together all digital charging solutions and seamlessly connect them with the operating system of its electric vehicles.
Mercedes-Benz consistently relies on the use of electricity from renewable energies. Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. . If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates (incl. EKOenergy ecolabel). These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.

Customer Benefits of MB.CHARGE Public

  • Access to one of the largest public charging networks globally: More than 3 million charging points from over 1,500 charge point operators are integrated worldwide.
  • Intelligent route planning: Navigation with Electric Intelligence calculates a time-efficient route including charging stops or guides the driver to the nearest charging point in the vicinity and at the destination.
  • Easy authentication: Authentication at the charging station is always carried out in the same user-friendly and familiar way via the Mercedes-Benz App, the RFID charging card, or directly via Plug & Charge¹ with cooperating charge point operators.
  • Seamless Charging Experience: With a single MB.CHARGE Public contract, customers can access charging points from numerous operators across different markets and use them through one integrated charging service.
  • Renewable Charging²:[2]Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates*. These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
    * Incl. EKOenergy ecolabel
    Mercedes-Benz consistently relies on the use of electricity from renewable energies. Renewable Charging[2]Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates*. These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
    * Incl. EKOenergy ecolabel
    is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging[2]Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates*. These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
    * Incl. EKOenergy ecolabel
    uses Energy Attribute Certificates (Incl. EKOenergy ecolabel). These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.

This article was last updated in August 2026.

¹ With Plug & Charge, the charging process starts as soon as the charging cable is plugged in. The vehicle transmits the contract data directly to the charging station. A prerequisite is an MB.CHARGE Public charging contract, which is used for billing.

² Mercedes-Benz consistently relies on the use of electricity from renewable energies. Renewable Charging[2]Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates*. These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
* Incl. EKOenergy ecolabel
is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging[2]Renewable Charging is an integral part of MB.CHARGE Public in Europe, the USA, Canada and China. If electricity from renewable energies is not yet available at the respective charging station, Renewable Charging uses Energy Attribute Certificates*. These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.
* Incl. EKOenergy ecolabel
uses Energy Attribute Certificates (incl. EKOenergy ecolabel). These ensure that an equivalent amount of electricity from renewable energies is fed into the power grid for charging processes via MB.CHARGE Public. They are from wind and solar power plants which are less than six years old.

MB.CHARGE Public.

MB.CHARGE Public offers easy access to one of the largest charging networks in the world.

Mercedes-Benz EQS 580 4MATIC charging.

Charging.

From electric vehicles, through wall boxes and charging services - overview about charging infrastructure at Mercedes-Benz.

Mercedes-Benz GLC.

E-Mobility.

The future of mobility is electrical and intelligent.